Introduction
Make the move and book your apartment at Sarba!
Strategically located near several points of interests, minutes away from restaurants, libraries, stores, coffee shops and much more, this under construction building holds both 120 sqm apartments and 130-135 sqm duplexes.
1-Concrete WorkSolid concrete construction
2-Construction and Partitions
External double wall
10 cm masonry blocks are used for internal partition
The separating wall between apartments is built using 20 cm masonry blocks
Waterproofing
3-Sanitary
PPR made in Europe
An independent 1 cubic meter plastic water tank for each apartment
A common water tank for the service of the whole building exists underground.
4-Electrical Installation
Le Grand Arteor or its equivalent
Videophone with a central key for the external gate or its equivalent
5-Internal Woodwork
All doors Fraket or Oak Veneer
Kitchen cabinets melamine boxes, granite work top
6-Exterior Woodwork (Aluminum)
Aluminum SIDEM 2000, double glazing with electrical shutters (Monobloc)
7-The Exterior
Stone cladding finishing covering 60% of facades, as for the remaining areas, rubberized waterproof decorative finish is applied.
Brick roof top
8-Floor and Walls Tiling
Ceramic first choice tiles
9-Internal Painting
Three layers of patty, and three layers of rubberized paint
10-Air-conditioning System
Drainage, copper and electrical installation
11-Parking
1 parking space