Introduction
Owning your dream apartment just got a whole lot easier with our flexible 3 Year Payment Facilities with a 0% Interest Rate.
Located in a prime location in the Safra area, this under construction project consists of 3 blocs offering a variety of 2 & 3 bedroom apartments starting $158,000 only.
Your new home also overlooks an astonishing panoramic sea view; perfect for morning coffees and late night gatherings.
Delivery date: April 2021
Call us today and benefit from the launching competitive price.
1-Concrete Work
Seismic design/structure
2-Construction and partitions
Double external walls
10 cm masonry blocks are used for internal partition
The separating wall between apartments is built using 20 cm masonry blocks.
3-Sanitary
PPR made in Europe
White Duravit, Bathco, Laufen or its equivalent
Grohe Eurosmat faucets, Bianchi or its equivalent
Accessory Chrome
An independent 1 cubic meter plastic water tank for each apartment
A common water tank for the service of the whole building exists in the underground.
4-Electrical Installation
Le Grand Arteor or its equivalent
Urmet-Italy Videophone with a central key for the external gate or its equivalent
Collective antenna
A VVVF elevator with Stainless Steel sliding doors and the cabin is made of wood and stainless.
Distribution of telephone lines in receptions
5-Internal Woodwork
American Frakke veneer doors for reception area with solid oak frame.
White painted MDF internal doors with solid wood frame.
Kitchen cabinets finished with egger laminate and melamine boxes, granite work top, Italian made stainless steel sink.
6-Exterior Woodwork (Aluminum)
Aluminum SIDEM 2000, double glazing with electrical shutters (Mono-block)
7-The Exterior
Stone cladding finishing covering 60% of facades, as for the remaining areas, rubberized waterproof decorative finish is applied.
8-Floor and Walls Tiling
Italian or Spanish made ceramic tiles
9-Internal Painting
Three layers of patty and three layers of rubberized paint in reception
One layer of patty and three layers of rubberized paint in bedrooms
10-Air-conditioning System
Copper piping will be provided for all rooms, as well as proper drainage and electrical outlets. Installation of AC split units in reception and master bedroom
11-External Spaces
External ramps and access facilities will be finished using embellished stamped concrete.
12-Parking
The parking floor is painted with Epoxy and rubberized paint for walls.